 |
The northeast corner of the Rowenhorst Student Center. The ribbed cement blocks added in the 1970s have been stripped off the front of the building, and large window openings have been downsized in the area that will house the college’s health and counseling services.
View photo |
|
 |
Nearly the entire north side of the RSC has been removed as part of the renovation process.
View photo |
|
 |
Workmen install plumbing in the area of the RSC that will house the building’s new café.
View photo |
|
 |
A loader lifts dirt into an area that will eventually be the loading dock for the café.
View photo |
|
 |
The northwest corner of the Rowenhorst Student Center, with a close-up view of the loading dock area for the RSC’s café.
View photo |
|